We can confirm after ten months hard work, their new extension will open on time!
The scheme which had a groundworks s/c package value of £300k to us consisted of:
- Demolition.
- Setting Out & Engineering.
- Ground Beams & Pile Caps.
- Reinforced Floor Slabs.
- Steel Frame Bolt Setting.
- Holorib Decking & Concrete Pouring To 1st, 2nd floors and roof.
- External hard and soft landscaping.