We have just been awarded a £200,000.00 groundworks and civil engineering contract for the alterations and construction required for a new Argos store at the Tollgate shopping centre in Colchester.
Our works include:
- Re-alignment of existing roads (including adoptable roads).
- Installation of modification of existing drainage.
- Construction of new UKPN substation.
- Groundworks to the new 500m2 portal frame extension to the existing unit.
Recent Comments