Completed January 2018 £600K
An extension to an existing factory building. Our works included the reduced level excavation and disposal to the required to the design level, excavation for the pile caps and ground beams, construction of the reinforced concrete ground floor slab, installation of new foul and storm pumping stations, installation of new attenuation storage system, external works and car parking.
Recent Comments