Gospel Hall, Sandon

Works commenced August 2018

Works are now complete on the new gathering hall. The works consisted of a cut and fill operation to get the site to the design level, excavation of deep strip foundations with bases and beams for the new steel frame, installation of 1100m2 power floated reinforced floor slab and concrete retaining walls, 2100m2 of porous paving, tarmac access roads and the installation of new foul pumping main and chamber with associated drainage, together with a storm water swale.