Internal Strip Out Works

We were engaged by our client to undertake the full strip out and internal demolition of a grade II listed property.

The works had to be undertaken is a safe and careful manner to maintain the structural stability of the property.

The works were required to enable the project engineer to inspect the original timber frame and to enable him to design a remedial scheme for the building.

The works involved the full strip out of all walls and ceilings including the removal of all lathe and plaster.

In addition, there was a requirement for the careful removal and storage of fireplaces and doors that were to be incorporated and re-use within the refurbished building.