New Commercial Maintenance Building, Braintree

Completed January 2019 £630K

Our works included the cut and fill operation to make up level, installation of piling mat and mobile crane bases, Main drainage up to 5m deep, new SUDS system, external works with porous paving and the construction of 1500m2 power floated reinforced ground floor slab.