We have recently undertaken a scheme to deliver a full groundworks solution for a new MOT station, our contract works included:

  • Setting Out.
  • Site Clearance.
  • Cut & fill.
  • Foundations for steel frame.
  • Drainage.
  • 250m2 Powerfloated floor.
  • Installation of 6m long inspection pit, 2.5m down within an area that has a very high water table.
  • Forming of concrete bases for ramps, break testers and pits.
  • External hard landscaping including asphalt and paving.