We have recently undertaken a scheme to deliver a full groundworks solution for a new MOT station, our contract works included:
- Setting Out.
- Site Clearance.
- Cut & fill.
- Foundations for steel frame.
- Drainage.
- 250m2 Powerfloated floor.
- Installation of 6m long inspection pit, 2.5m down within an area that has a very high water table.
- Forming of concrete bases for ramps, break testers and pits.
- External hard landscaping including asphalt and paving.